September 2021
Mobile, AL

Resolve Marine was contracted to assist with the refloat of a jack-up drilling platform that sank at a local Mobile area shipyard during decommissioning operations. Resolve Marine utilized seven 6” Grindex pumps in a pressure-compensated pumping arrangement to successfully dewater the lower ‘mud mat’ tank spaces and refloat the 3,500-ton vessel. Divers worked through several challenges to complete the project, including locating and patching damages with near zero visibility, as well as tracing out and blanking the tank pipework.

Tags:
  • Refloat
  • Stabilization