December 2020
Bahamas
Resolve was contracted by a marine petroleum terminal to provide marine support for Dolphin Replacements. The work was done using Resolve’s RMG 1000 Barge equipped with an American 11320 crawler crane. The team operated out of New Small Jetty and removed several catwalk sections and then reinstalled newly fabricated dolphins and refurbished catwalks. The walkways were around 250’ long which is the key element that made the project a challenge.