GBSY Drydock 1
Caribbean | Bahamas
Resolve Marine was contracted to refloat the dry dock. The team worked in consort with shipyard staff and utilized local equipment and fabrication facilities to construct the salvage patches. Any points of ingress were patched and 12x high-capacity electric submersible pumps were installed. These were used in conjunction with the DD1’s onboard pumping system to refloat the dock. Once the drydock was brought to the surface the remainder of the tanks were stripped and additional patches were installed. The DD1 was then safely redelivered back to the client.