GBSY Drydock 2
Caribbean | Bahamas
![A double-bay dry dock](/siteFiles/Projects/GBSY Drydock 2.jpg)
Resolve Marine was contracted to remove the 900ft structure from the seabed. The dry dock was first cut in half using a drop chisel. Each section was then patched and refloated using a combination of compressed air and high-capacity submersible pumps. Once refloated the damaged wing wall sections were scrapped using oxy/acetylene torches.